Engineering Management

Engineering Management is a specialized form of management that is concerned with the application of engineering principles to business practice. Engineering management is a career that brings together the technological problem-solving savvy of engineering and the organizational, administrative, and planning abilities of management in order to oversee complex enterprises from conception to completion

  • PMP

  • BMS

  • MS Project

  • CAMP

  • Primavera



PMP 36 Hr

  1. Introduction to Project Management:
  2. Scope Management:
  3. Time Management:
  4. Cost Management
  5. Quality Management:
  6. Human Resources Management:
  7. Communications Management:
  8. Risk Management:
  9. Contract and Procurement Management:
  10. Professional Responsibility & Code of Professional Conduct.
  11. What Is the PMP Exam Like?

 

 

BMS 30 Hr

  1.  BMS Content
    1- The meaning of BMS & it's advantages.
    2- Explaining some applications where the BMS system can be used (Principle of operation).
    3- Explaining some classic control circuits & design of motor control center panels (MCC).
    a) Direct on line circuit (DOL )
    b) Reverse direction circuit (2 direction circuit)
    c) Star – Delta circuit
    d) Tow speed circuit ( Dalender )
    4- Types of BMS Brands.
    5- The goal of the use of BMS system.
    6- Components of control system.
    7- The meaning of I / O Points.
    8- Types of sensors which used in BMS system.
    9- Types of Modules & Auxiliary devices which used in BMS system.
    10- Explaining the application with using BMS system
    a) HVAC system (Chiller – AHU – Cooling Tower – Fan coil unit – Exhaust fan Boilers – Compressors – Dryer - Heat Exchanger -….etc.)
    b) Lighting
    c) Elevators
    d) Fire system
    e) Train gats
    f) Pumps
    11- The Meaning of view builder.
    12- The Meaning of Site builder.
    13- The Meaning of Network System & Standalone.
    14- Built up the Program control according to application which you need control it.
    15- Sequence of startup of BMS Projects.
    16- Match between Motor control system panels & BMS system.
    17- Steps of the receipt of BMS project.
    18- Validation of HVAC system by using BMS system.

MS Project 20 Hr

  1. Ms Project: Getting Started
    1.  Getting started with Ms Project
    2. Global Setting
    3. Defining Calendars
  2. Ms Project: Schedule
    1. Defining Activities and Relationships
    2. Project schedule
    3. Case Study
  3. Project Schedule
    1. Project organization
    2. Filters
    3. Defining Constraints
    4. Case Study
  4. Project Resources
    1. Defining and assigning resources
    2. Resource leveling
    3. Cost loaded schedule
  5. Updating     
    1. Creating baseline
    2. Applying actual
    3. Schedule updating
  6. Case Study
    1. Case study project
    2. Conclusions and Post-test

 

CMAP

CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT
CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT

Primavera 24 Hr

  1. Overview
  2. Admin Settings
  3. User preferences
  4. Enterprise Project Structure (EPS)
  5. Organization Breakdown Structure (OBS)
  6. Resources
  7. Work breakdown Structure (WBS)
  8. Budgets
  9. Project Codes
  10. User Defined Fields
  11. Calendars
  12. Activities
  13. Expense Categories
  14. Baseline Types
  15. Risks
  16. Work Products & Documents
  17. Projects Tracking

 

 

Hazcom Program (chemical hazard commuincation) - 20 (HRS)

CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT
CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT

Hazardous Area Classification - 20 (HRS)

CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT
CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT

 


Hazardous Area Classification - 20 (HRS)

CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT
CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT


Hazards Identification & Risk Assessment

CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT
CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT


Safety Performance at work place - 20 (hrs)

CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT
CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT


Scaffolding Review & Inspection - 20 (hrs)

CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT
CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT CONTENT

Register now for any Course: Online registation Join here